| 注册
首页|期刊导航|陕西煤炭|厚煤层综放工作面覆岩两带发育高度研究

厚煤层综放工作面覆岩两带发育高度研究

侯成云

陕西煤炭2025,Vol.44Issue(9):26-30,5.
陕西煤炭2025,Vol.44Issue(9):26-30,5.DOI:10.20120/j.cnki.issn.1671-749x.2025.0905

厚煤层综放工作面覆岩两带发育高度研究

Development height of two zones of overburden rock in thick coal seam fully mechanized caving face

侯成云1

作者信息

  • 1. 晋能控股装备制造集团晟泰青洼煤业有限公司,山西 临汾 043500
  • 折叠

摘要

Abstract

In the process of coal mining,the development height of overburden"two zones"(collapse zone and water-conduc-ting fissure zone)is an important parameter for the prevention and control of water hazards in mines,and it is of great signifi-cance to accurately predict and control the development height of the"two zones"to ensure the safe production of mines and to prevent water hazards accidents.Taking the 2207 comprehensively mechanized working face of No.2 coal seam in Qingwa Mine as the research object,UDEC numerical simulation software was used to construct the model and carry out the excava-tion simulation to analyze the damage of overburden rock at different advancing distances of the face,and measure the height of the overburden rock development of the two zones after the mining of the comprehensive mechanized working face,and through simulation,the height of the collapse zone ranging from 13.7 to 16.2 m,and the height of the fissure zone ranging from 46.2 to 50.7 m were obtained.In order to verify the accuracy of the simulation results,empirical formula calculations and in-site measurements were carried out,showing that the numerical simulation results are basically consistent with the empirical formula calculations and in-site measurements.

关键词

垮落带/导水裂隙带/数值模拟/煤矿开采

Key words

collapse zone/water-conducting fractured zone/numerical simulation/coal mining

分类

矿业与冶金

引用本文复制引用

侯成云..厚煤层综放工作面覆岩两带发育高度研究[J].陕西煤炭,2025,44(9):26-30,5.

陕西煤炭

1671-749X

访问量0
|
下载量0
段落导航相关论文