首页|期刊导航|Railway Sciences|Study on lifecycle management of high-speed rail catenary system under the MDD-APC theory
Railway Sciences2025,Vol.4Issue(3):P.410-422,13.DOI:10.1108/RS-12-2024-0050
Study on lifecycle management of high-speed rail catenary system under the MDD-APC theory
摘要
关键词
Intelligent HSR/Catenary system/Lifecycle management/Building information modeling(BIM)/Data circulation分类
交通工程引用本文复制引用
Rui Li,Ping Li,Chenkang Wu,Xue Zhang..Study on lifecycle management of high-speed rail catenary system under the MDD-APC theory[J].Railway Sciences,2025,4(3):P.410-422,13.基金项目
supported by China Academy of Railway Sciences Foundation(Research on Multi Agent Collaborative Mechanism of Intelligent High Speed Rail System Based on Complex Adaptive System Theory,Grant 2023YJ392). (Research on Multi Agent Collaborative Mechanism of Intelligent High Speed Rail System Based on Complex Adaptive System Theory,Grant 2023YJ392)