交通节能与环保2025,Vol.21Issue(4):212-216,5.DOI:10.3969/j.issn.1673-6478.2025.04.044
钢锚管框格梁加固杂填土边坡工艺分析和研究
Analysis and Research on the Reinforcement Process of Mixed Fill Soil Slope with Steel Anchor Pipe Frame Grid Beam
王炳军 1温永杰2
作者信息
- 1. 浙江明康工程咨询有限公司,浙江 杭州 310009
- 2. 中国市政工程华北设计研究总院有限公司,天津 300074
- 折叠
摘要
Abstract
This paper takes the reinforcement of the road cutting slope of the traffic hub square in a certain place in Jinhua as the background,and improves the anchor pipe secondary splitting grouting reinforcement process.By increasing the diffusion radius of the grouting body in the miscellaneous fill slope,the mechanical parameters of the rock and soil mass the miscellaneous fill slope are improved,so that the steel anchor pipe and the surrounding rock and soil mass form a whole,and a tree-like expansion anchor solid is formed the steel anchor pipe,which works with the grid beam to achieve the purpose of ensuring the stability of the miscellaneous fill slope.关键词
杂填土/边坡/钢锚管/二次注浆Key words
miscellaneous fill/slope/steel anchor pipe/secondary grouting分类
交通工程引用本文复制引用
王炳军,温永杰..钢锚管框格梁加固杂填土边坡工艺分析和研究[J].交通节能与环保,2025,21(4):212-216,5.