世界有色金属Issue(14):29-31,3.
电炉渣水淬系统改为缓冷系统的生产实践
Production practice of converting electric furnace slag water quenching system to slow cooling system
郑春雨1
作者信息
- 1. 铜陵有色金属集团股份有限公司 金冠铜业分公司,安徽 铜陵 244000
- 折叠
摘要
Abstract
In order to further integrate resources and improve the copper recovery rate of the entire plant to increase the economic benefits of the enterprise,this paper introduces the process of converting the electric furnace slag water quenching system to a slow cooling system,as well as the slow cooling process and the implementation of major equipment.It discusses the problems that have existed since the trial operation of the slag slow cooling system and proposes solutions,effectively ensuring the stable operation of the entire system and providing a reference for the design and production organization of subsequent copper smelting slag slow cooling processes.关键词
铜/电炉渣/缓冷/智能化Key words
Copper/Electric Furnace Slag/Slow Cooling/Intelligence分类
矿业与冶金引用本文复制引用
郑春雨..电炉渣水淬系统改为缓冷系统的生产实践[J].世界有色金属,2025,(14):29-31,3.