基坑开挖方式对既有下卧地铁隧道变形的影响研究

李永波 张家威 赵歆 徐少云

天津建设科技2025,Vol.35Issue(4):21-24,4.
天津建设科技2025,Vol.35Issue(4):21-24,4.DOI:10.3969/j.issn.1008-3197.2025.04.006

基坑开挖方式对既有下卧地铁隧道变形的影响研究

The Influence of Foundation Pit Excavation Methods on Deformation of Existing Underlying Subway Tunnel

李永波 1张家威 2赵歆 2徐少云1

作者信息

  • 1. 江苏工程职业技术学院,江苏 南通 226007
  • 2. 天津市政工程设计研究总院有限公司,天津 300392
  • 折叠

摘要

Abstract

To investigate the influence of foundation pit excavation methods on the deformation of existing underlying subway tunnels,a three-dimensional strata-tunnel-foundation pit analysis model was established using the MIDAS GTS NX finite element software,focusing on a proposed deep and large foundation pit excavation di-rectly above a shield tunnel in Tianjin.By comparing two excavation schemes—conventional excavation with-out ground reinforcement and excavation with depth zoning combined with portal-type reinforcement using ce-ment-mixing piles—the study analyzes the effects of foundation pit excavation on the horizontal and vertical deformation as well as longitudinal differential settlement of the tunnel.The results indicate that conventional excavation without reinforcement caused tunnel deformations exceeding control limits,while the reinforce-ment scheme effectivelled controls tunnel deformations,ensuring compliance with requirements.

关键词

盾构隧道/基坑开挖/地层加固

Key words

shield tunnel/foundation pit excavation/stratum reinforcement

分类

建筑与水利

引用本文复制引用

李永波,张家威,赵歆,徐少云..基坑开挖方式对既有下卧地铁隧道变形的影响研究[J].天津建设科技,2025,35(4):21-24,4.