| 注册
首页|期刊导航|Energy and Built Environment|Heat supply prediction method of a heat pump system based on timing analysis and a neural network

Heat supply prediction method of a heat pump system based on timing analysis and a neural network

Xin Liu Xiuhui Wu Jingmeng Sang Kailiang Huang Guohui Feng Mengmeng Song Xiangdong Wang

Energy and Built Environment2025,Vol.6Issue(4):P.676-688,13.
Energy and Built Environment2025,Vol.6Issue(4):P.676-688,13.DOI:10.1016/j.enbenv.2024.02.005

Heat supply prediction method of a heat pump system based on timing analysis and a neural network

Xin Liu 1Xiuhui Wu 1Jingmeng Sang 2Kailiang Huang 1Guohui Feng 1Mengmeng Song 1Xiangdong Wang1

作者信息

  • 1. School of Municipal and Environment Engineering,Shenyang Jianzhu University,Shenyang,100168,China
  • 2. JianKe EET Co.,Ltd,Beijing 100013,China
  • 折叠

摘要

关键词

Heat supply prediction/Energy efficiency/ARIMA-BP integrated model/Training sets

分类

建筑与水利

引用本文复制引用

Xin Liu,Xiuhui Wu,Jingmeng Sang,Kailiang Huang,Guohui Feng,Mengmeng Song,Xiangdong Wang..Heat supply prediction method of a heat pump system based on timing analysis and a neural network[J].Energy and Built Environment,2025,6(4):P.676-688,13.

基金项目

the National Natural Science Foundation of China(project number 52108081) (project number 52108081)

the Foundation of Liaoning Province Education Administration(Project number LJKZ0577)for providing financial support and thank you to the reviewers for their advice and comments. (Project number LJKZ0577)

Energy and Built Environment

2666-1233

访问量0
|
下载量0
段落导航相关论文