广东水利水电Issue(9):1-5,11,6.
"22·6"北江特大洪水涉河建设项目调查及影响分析
Investigation and Impact of Construction Projects during"22·6"Beijiang Catastrophic Flood
任启伟 1谭超 2徐小飞 1沈璐 1魏俊彪 2张瀚2
作者信息
- 1. 广东省水利水电技术中心,广州 510635
- 2. 广东省水利水电科学研究院,广州 510635
- 折叠
摘要
Abstract
The impact of construction projects on river flood control is an important issue in river and lake management.The statistics of beijiang construction project are investigated in this paper.The construction projects are applied to flood control assessment.The construction organization design is still imperfect in the technical review.The numerical simulation is conducted to analyze water level variation which indicted the escalation in water level affected by the superposition of river-related construction projects.The key content of construction projects review is proposed which combined with the investigated water level results.This results show significant effectiveness in flood control assessment and disaster reduction ability.关键词
"22·6"北江特大洪水/河湖水域岸线空间管控/涉河建设项目/防洪评价Key words
"22·6"Beijiang catastrophic flood/river and lake management/construction project/flood control assessment分类
建筑与水利引用本文复制引用
任启伟,谭超,徐小飞,沈璐,魏俊彪,张瀚.."22·6"北江特大洪水涉河建设项目调查及影响分析[J].广东水利水电,2025,(9):1-5,11,6.