大掠马泵站工程变电站布置方案浅析

Substation Layout Scheme for the Dalüema Pump Station Project

王爽 1李郑淼2

作者信息

  • 1. 中水北方勘测设计研究有限责任公司,天津 300222
  • 2. 中国水利水电科学研究院,北京 100038
  • 折叠

摘要

Abstract

The Dalüema Pump Station reconstruction project is equipped with four vertical axial-flow pumps,each is driven by a 160 kW motor,resulting in a total installed capacity of 640 kW.The maximum operational condition involves all four pump units running simultaneously.Based on the station's load requirements,a 1,000 kVA main transformer was installed.Considering the power supply needs,investment costs,and construction duration of the Dalüema Pump Station,five substation layout schemes were comparatively analyzed,and a relatively optimal solution—the box-type substation layout—was proposed.This scheme not only enhanced the overall layout of the pump station but also ensured the safety,stability,reliability,periodicity,environmental friendliness,and economic efficiency of the power supply system.The comparison and selection of different schemes provide valuable references for the field of power distribution in water conservancy projects.

关键词

大掠马泵站/变压器布置方案/设计方案比选/箱式变电站

Key words

Dalüema Pump Station/transformer layout scheme/design scheme comparison/box-type substation