LNG储罐投产预冷过程管控
Management and Control of Pre-cooling Process for LNG Storage Tank Commissioning
时开盈1
作者信息
- 1. 河南省天然气储运有限公司,河南郑州 450008
- 折叠
摘要
Abstract
The standard pre-cooling curve and pre-cooling process of LNG storage tanks are elaborated.The key control points during the pre-cooling process,matters needing attention during the pre-cooling process,as well as the monitoring and treatment of pipeline pre-cooling displacement were analyzed.The potential challenges in the pre-cooling process and correspond-ing countermeasures are discussed.关键词
LNG储罐/预冷速度/控制要点Key words
LNG storage tank/pre-cooling velocity/con-trol key points分类