Dynamic process of the 2000 Yigong high-speed landslide

江勇 1白玲 1李鸿儒 1陈治文 1吴智超1

作者信息

  • 1. 中国科学院青藏高原研究所青藏高原地球系统与资源环境国家重点实验室,北京 100101||中国科学院大学,北京 100049
  • 折叠

摘要

Abstract

At Beijing time 19:58 on April 9,2000,a large landslide occurred in Yigong area,Bomi County,Linzhi City,southeastern Qinghai-Xizang Plateau,caused extensive damage to about 8 km2 of forest,blocked the river and formed the Yigong lake.Seismic waves can remotely detect the occurrence process of landslide events,which helps to quantitatively analyze their dynamic parameters of different sliding stages.Because of the large size and strong energy of the event,the seismic waveform of the Yigong landslide can be clearly seen on the remote seismic stations.We analyzed the dynamic process of the 2000 Yigong landslide using broadband seismic wave-forms of the China Earthquake Networks Center,and found that the event lasted about 215 s,including the pre-slip initialization(about 65 s),the main slip(about 90 s),and the post-slip adjustment(about 60 s)phases.The duration of the initialization phase is relatively long and the low-frequency signal is weak.However the high-frequency sig-nal gradually increased,indicating that the landslide is started with broken collapse.The main sliding phase is fur-ther divided into accelerated and decelerated sliding stages.During the accelerated sliding stage,the amplitudes of both the high-frequency and low-frequency signals are large.The terrain slope is steep and the material accelerated to slide in the Zhamunong valley.About 35 s after the acceleration process,the maximum speed reached about 191 m/s and the horizontal displacement of the landslide movement is about 3.1 km.By comparison,during the de-celeration sliding stage,both the high-frequency and low-frequency signals decreased.This observation is corres-ponding to the widening of the landslide bed and the slowing of the slope.Then the speed of landslide movement continuously decreased to zero.The maximum horizontal and vertical displacements reached about 6.0 km and 3.2 km after 90 s,respectively.In the post-sliding adjustment stage,the amplitude of both high-frequency and low-frequency signals gradually weakens,which mainly reflects the scattered deposition of landslide materials at the bottom of the Zhamunong valley.The volume and sliding speed of the 2000 Yigong landslide is obviously larger than other landslides that have recently occurred in the southeastern Qinghai-Xizang Plateau.These observations suggest that the sliding friction of sediments in the valley decreased due to melting water and precipitation in the source area and giant deposits are formed.It is the major reason for the blockage of the Yigong Zangbu river and the formation of the Yigong Lake.

关键词

2000年易贡滑坡/波形反演/受力时间函数

Key words

2000 Yigong landslide/waveform inversion/force time function

分类

天文与地球科学

引用本文复制引用

江勇,白玲,李鸿儒,陈治文,吴智超..2000年易贡高速滑坡的动力学过程[J].地球与行星物理论评(中英文),2026,57(1):62-69,8.

基金项目

国家自然科学基金资助项目(42130312) (42130312)

第二次青藏高原综合科学考察资助项目(2019QZKK07)Supported by the National Natural Science Foundation of China(Grant No.42130312),and the Second Tibetan Plateau Scientifc Expedition and Research Program(Grant No.2019QZKK07) (2019QZKK07)