铁路通信信号工程技术2025,Vol.22Issue(9):40-45,94,7.DOI:10.3969/j.issn.1673-4440.2025.09.007
C3列控无线超时RBC侧优化建议
Optimization Suggestions on RBC Side for Radio Timeout of CTCS-3 Train Control System
摘要
Abstract
This paper first reviews the radio communication technology system on the RBC side of the CTCS-3 train control system,and then summarizes the main radio timeout issues discovered during the operation of the CTCS-3 train control system.It finally proposes corresponding solutions for the main radio timeout issues,and describes the technical feasibility of their implementation.关键词
CTCS-3列控系统/车-地无线通信/无线超时Key words
CTCS-3 train control system/track-train radio communication/radio timeout分类
交通工程引用本文复制引用
孙宏伟,田宏达..C3列控无线超时RBC侧优化建议[J].铁路通信信号工程技术,2025,22(9):40-45,94,7.基金项目
中国国家铁路集团有限公司科技研究开发计划系统性重大项目(P2024G003) (P2024G003)