桩基固定式海上光伏项目建设条件和关键点研究
Study on Construction Conditions and Key Points of Pile-Fixed Offshore Photovoltaic Projects
摘要
Abstract
In recent years,due to the high"threshold"for offshore photovoltaic development and the fact that construction technologies have not yet reached a mature level,pile-fixed offshore photovoltaic projects have emerged as a result.Based on a pile-fixed offshore photovoltaic project in Shandong Province,this study adopts the method of engineering case analysis to extract and summarize the con-struction conditions and key management and control points of pile-fixed offshore photovoltaic projects.The results show that scientific site selection planning,structural design,and equipment selection are important conditions for the successful implementation of the pro-ject;reasonable deployment of the entire construction process,quality and safety management and control,as well as optimization and innovation in construction techniques,material application,and intelligent management are the keys to ensuring the smooth implemen-tation of the project.Through overall planning and control of key links,not only the construction period is significantly shortened and construction risks are effectively reduced,but also the overall efficiency and economy of the project are improved.The pile-fixed con-struction method can provide valuable reference experience for similar engineering projects.关键词
桩基固定式/海上光伏/建设条件/施工关键/模块化施工Key words
pile-fixed type/offshore photovoltaic/construction conditions/construction key points/modular construction分类
信息技术与安全科学引用本文复制引用
高巧红,潘欣,张艳,赵刚毅,刘红学..桩基固定式海上光伏项目建设条件和关键点研究[J].西北水电,2025,(4):112-116,5.基金项目
国家自然科学基金项目(52271355) (52271355)