云南水力发电2025,Vol.41Issue(9):28-30,3.DOI:10.3969/j.issn.1006-3951.2025.09.007
抚宁抽水蓄能电站下水库右岸渗漏分析
Analysis of Leakage on the Right Bank of the Lower Reservoir of Funing Pumped Storage Power Station
刘英 1于立宏 2袁健楠 2刘德斌 2张学林2
作者信息
- 1. 吉林建筑大学,吉林 长春 130118
- 2. 中国电建集团北京勘测设计研究院有限公司,北京 100024
- 折叠
摘要
Abstract
The mountain on the right bank of the lower reservoir of Funing Pumped Storage Power Station is thin,and there is a problem of water leakage from the reservoir.On the basis of engineering geological analysis,the finite element seepage software developed using Laplace equation was used to accurately calculate the amount of water leakage in the reservoir.The comprehensive analysis predicted the amount and channels of water leakage after reservoir storage.Then,the finite element seepage software was used for calculation and analysis.It was analyzed and verified that only anti-seepage treatment of the local area on the right bank can significantly reduce the amount of water leakage after reservoir storage,providing forward-looking technical guidance for the final design and engineering treatment of the reservoir.关键词
库岸/渗漏/有限元/渗流软件/风化Key words
warehouse bank/leakage/finite element method/seepage software/weathering分类
建筑与水利引用本文复制引用
刘英,于立宏,袁健楠,刘德斌,张学林..抚宁抽水蓄能电站下水库右岸渗漏分析[J].云南水力发电,2025,41(9):28-30,3.