| 注册
首页|期刊导航|云南水力发电|烂泥山水库沥青混凝土心墙堆石坝设计

烂泥山水库沥青混凝土心墙堆石坝设计

李磊 张健

云南水力发电2025,Vol.41Issue(9):44-46,3.
云南水力发电2025,Vol.41Issue(9):44-46,3.DOI:10.3969/j.issn.1006-3951.2025.09.011

烂泥山水库沥青混凝土心墙堆石坝设计

Design of Asphalt Concrete Core Rockfill Dam for Muddy Mountain Reservoir

李磊 1张健2

作者信息

  • 1. 贵州普泽工程有限公司,贵州 贵阳 550081
  • 2. 贵州省黔中水利枢纽工程建设管理局,贵州 贵阳 550081
  • 折叠

摘要

Abstract

Asphalt concrete core rockfill dam has a simple foundation treatment,high local material utilization rate,and wide adaptability.It has become the main dam type in northwest regions such as Xinjiang,but is less used in Guizhou region.Due to poor geological conditions of the dam foundation and difficulties in utilizing local materials,after sufficient demonstration,the recommended concrete gravity dam for the feasibility study stage of Lannishan Reservoir has been changed to an asphalt concrete core wall sandy shale rock fill dam.The new construction of this reservoir will provide reference for soft rock dam construction in Guizhou region.

关键词

烂泥山水库/混凝土心墙/砂质页岩堆石坝

Key words

Lannishan Reservoir/concrete core wall/sandstone shale rockfill dam

分类

建筑与水利

引用本文复制引用

李磊,张健..烂泥山水库沥青混凝土心墙堆石坝设计[J].云南水力发电,2025,41(9):44-46,3.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文