中国地质调查2025,Vol.12Issue(4):93-102,10.DOI:10.19388/j.zgdzdc.2023.316
黄土丘陵沟壑区煤炭地下开采扰动下的自然恢复
Natural restoration in the loess hilly and gully region under the disturbance of underground coal mining
摘要
Abstract
As an important energy base,Ordos is part of the Loess Plateau and has a very fragile ecosystem.A large number of open-pit mines,spoil heaps and subsidence areas have been created with the large-scale coal mining.Chuancaogedan coal mine in Zhungeer Banner was selected as the research object to study the natural res-toration effect and methods of collapse fractures in the coal underground mining-induced subsidence areas in lo-ess hilly and gully region.Remote sensing interpretation,soil measurement and other means were used to con-struct a natural recovery model of edge cracks,based on revised universal soil loss equation(RUSLE).The natu-ral restoration characteristics of collapse fractures were studied and restoration suggestions were put forward.The results show that the collapse areas in loess hilly and gully region have zonal characteristics.The dynamic frac-tures area could basically recover within one year under natural restoration,and the restoration effect is good.The natural restoration effect of the edge crack area is poor and it is difficult to recover for a long time,with the longest simulated restoration time reaching 26.2 years.The research shows that the restoration of collapse areas should a-dopt a nature-based zonal restoration method.The research results could provide references for the restoration and governance of collapse fractures caused by underground mining in loess hilly and gully region.关键词
井下开采/动态裂缝/边缘裂缝/自然修复/RUSLE模型Key words
underground mining/dynamic fracture/marginal fracture/natural restoration/RUSLE model分类
天文与地球科学引用本文复制引用
王志民,岳喜能,秦越强,柴晨晖,孙宇飞,冯欣..黄土丘陵沟壑区煤炭地下开采扰动下的自然恢复[J].中国地质调查,2025,12(4):93-102,10.基金项目
中国地质调查局"鄂尔多斯市准格尔旗煤炭矿集区生态修复支撑调查(编号:DD20208078)"项目资助. (编号:DD20208078)