东北水利水电2025,Vol.43Issue(9):10-13,27,5.
超高水头抽水蓄能电站引水调压室初拟判定敏感因素分析
Analysis on initial determination sensitive factors of water diversion pressure regulating room in ultra-high head pumped storage power stations
刘寅 1陈晶晶1
作者信息
- 1. 中国电建集团西北勘测设计研究院有限公司,陕西 西安 710065
- 折叠
摘要
Abstract
With the emergence of an increasing number of ultra-high rated head pumped storage power stations,the key technologies of water diversion system design have become increasingly prominent for the economy,safety and reliability of the entire project.However,at present,there are relatively few experiences that can be drawn on in terms of ultra-high head operation,water convey ance system design principles and unit adaptability.This paper analyzes and discusses the correlation between the initial determination of the water diversion pressure regulating chamber and the layout of the water transmission system,the hydraulic transition process,construction conditions and investment.It also analyzes the sensitive factors of the preliminary criteria for setting a pressure regulat ing chamber in the water diversion system of ultra-high head pumped storage power stations,providing a basis for optimizing the layout plan of the water diversion system and determining the selection range of the pipe diameter of the water diversion system.关键词
超高水头/抽水蓄能电站/引水调压室/敏感因素Key words
ultra-high head/pumped storage power station/water diversion pressure regulating room/sensitive factors分类
建筑与水利引用本文复制引用
刘寅,陈晶晶..超高水头抽水蓄能电站引水调压室初拟判定敏感因素分析[J].东北水利水电,2025,43(9):10-13,27,5.