摘要

Abstract

To promote the high-proportion consumption of distributed photovoltaic(PV)power and drive the implementation of large-scale power substitution,an optimized scheduling plan based on source-load coordination for agricultural parks has been proposed.Firstly,vari-ous types of equipment in the planting and breeding scenarios in the park are modelled in great details and the potential,characteristics,and flexibility of agricultural electrified loads to participate in load regulation are analyzed and clustered.Secondly,a multi-objective opti-mization model that takes into the consumption rate of distributed PV energy and the operational cost of the equipment are taken into ac-count,as the constraints are on the operation of the equipment and the energy demand of agricultural production.The objective is to carry out coordinated scheduling of the integrated energy system in the park.Finally,a simulation analysis is conducted in a high percentage electricity substitution agricultural park in South China as an example,and the results verify the effectiveness of the proposed method in improving the PV consumption rate,reducing the park's operating costs,and promoting large-scale electricity substitution.

关键词

农业园区/综合能源系统/光伏消纳/需求响应/优化调度

Key words

agricultural parks/integrated energy systems/photovoltaic consumption/demand response/optimize scheduling

分类

信息技术与安全科学

引用本文复制引用

郑之轩,倪妮,吴思媛..计及光伏消纳和需求响应的典型农业园区调度优化[J].电力需求侧管理,2025,27(5):30-35,6.

基金项目

南网贵州电网有限责任公司项目(060300RT24120653) (060300RT24120653)

电力需求侧管理

1009-1831

访问量0
|
下载量0
段落导航相关论文