| 注册
首页|期刊导航|铁道标准设计|铁路桥跨方案自动布置算法初探

铁路桥跨方案自动布置算法初探

柏华军 郑洪 陈瓴 刘峰

铁道标准设计2025,Vol.69Issue(9):87-94,8.
铁道标准设计2025,Vol.69Issue(9):87-94,8.DOI:10.13238/j.issn.1004-2954.202306230002

铁路桥跨方案自动布置算法初探

Preliminary Study on Automatic Layout Algorithm for Railway Bridge Span Schemes

柏华军 1郑洪 1陈瓴 1刘峰2

作者信息

  • 1. 中铁第四勘察设计院集团有限公司,武汉 430063
  • 2. 武汉大学计算机学院,武汉 430072
  • 折叠

摘要

Abstract

To address the challenges of multiple influencing factors,high design complexity,and low efficiency in manual design of high-speed railway bridge span schemes in China,an automatic layout algorithm for railway bridge span schemes is developed to realize the automatic scheme generation meeting the constraints and recommended optimal solutions.The bridge span layout problem was abstracted as an optimization problem subject to constraints from control point sets and beam type libraries.Using a multi-strategy fusion approach and simulating the span layout workflow,a main beam layout algorithm was developed,using a greedy strategy for selecting main beams at control points.Then,the main beam bridging algorithm was developed by backtracking and dynamic programming strategies to bridge the main beam segments between adjacent control points.Finally,a bridge span scheme evaluation algorithm was constructed based on expert scoring,using combined evaluation indices such as beam cost and clearance-violating piers,to evaluate multiple schemes and recommend the optimal ones.Simulation design verification on Changsha-Ganzhou High-speed Railway showed that the algorithm greatly improved the work efficiency of bridge span layout.

关键词

高速铁路/铁路桥梁/桥跨方案/布孔设计/约束条件/回溯策略/贪心策略/动态规划策略

Key words

high-speed railway/railway bridge/bridge span scheme/span layout design/constraint/backtracking strategy/greedy strategy/dynamic programming strategy

分类

交通工程

引用本文复制引用

柏华军,郑洪,陈瓴,刘峰..铁路桥跨方案自动布置算法初探[J].铁道标准设计,2025,69(9):87-94,8.

基金项目

国家重点研发计划项目(2021YFB2600400) (2021YFB2600400)

中国铁建股份有限公司科技研发计划项目(2022-A02) (2022-A02)

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文