| 注册
首页|期刊导航|电力勘测设计|输电线路工程机械挖孔基础技术方案及经济分析

输电线路工程机械挖孔基础技术方案及经济分析

朱家源 王玉 董晗拓 庄志翔

电力勘测设计Issue(9):38-41,50,5.
电力勘测设计Issue(9):38-41,50,5.DOI:10.13500/j.dlkcsj.issn1671-9913.2025.09.007

输电线路工程机械挖孔基础技术方案及经济分析

Research on the Drilled Shaft Foundation of Transmission Line Construction

朱家源 1王玉 1董晗拓 2庄志翔1

作者信息

  • 1. 中国能源建设集团广东省电力设计研究院有限公司,广东 广州 510663
  • 2. 广东电网有限责任公司电网规划研究中心,广东 广州 510080
  • 折叠

摘要

Abstract

In order to reduce the risks of transmission line construction,the drilled shaft foundation is adopted to replace the traditional manual shaft foundation.Through a comparison with manual shaft foundation,the feasibility of drilled shaft foundation is analyzed in terms of equipment mobilization plan,foundation design scheme,and environmental conservation measures.Based on an ultra-high voltage transmission line construction,a technical-economic analysis is conducted to determine the cost-effective construction length for mechanized road.The design of drilled shaft foundation is similar to that of manual shaft foundation.However,environmental protection measures need to be taken to reduce the impact of mechanized road.Moreover,the cost of drilled shaft foundation increases with the length of mechanized road.And the cost of drilled shaft foundation and manual shaft foundation is equivalent when the length of the road reaches 473 m.Drilled shaft foundation can be applied to transmission line construction with suitable terrain conditions.

关键词

输电线路/机械化/挖孔基础/特高压/技术经济

Key words

transmission line/mechanization/shaft foundation/ultra-high voltage/technical economy

分类

信息技术与安全科学

引用本文复制引用

朱家源,王玉,董晗拓,庄志翔..输电线路工程机械挖孔基础技术方案及经济分析[J].电力勘测设计,2025,(9):38-41,50,5.

电力勘测设计

1671-9913

访问量0
|
下载量0
段落导航相关论文