东北水利水电2025,Vol.43Issue(10):11-13,3.
沿海地区某水闸汛期施工导流方案研究
Research on construction diversion scheme for a sluice gate in coastal areas during flood season
贾瑞旗 1郑慧洋1
作者信息
- 1. 中水北方勘测设计研究有限责任公司,天津 300222
- 折叠
摘要
Abstract
The flood season in the southern coastal areas is characterized by large peak flow,long duration,and superimposition of typhoons and sea tides.The traditional dry season construction diversion plan for water gates is difficult to meet the construction period requirements.Based on the hydrological analysis,geological conditions and hydraulic calculations of a certain water gate proj ect,this paper proposes a flood season diversion scheme suitable for water gates along the southern coast by optimizing the design of diversion periods,the layout form of diversion facilities and the selection of cofferdam materials.The optimized scheme has advantages such as time-saving,convenient construction,strong impact resistance,and good construction continuity.It systematically addresses the problems of insufficient flood control capacity and restricted construction period in traditional schemes,and has verified the flood and typhoon resistance capabilities of the scheme in practical engineering applications.This research,through the combination of theoretical innovation and engineering practice,provides a scientific reference for the flood diversion construction of similar projects during the flood season.关键词
汛期/水闸/围堰/导流/工期Key words
flood season/sluice gate/cofferdam/diversion/construction period分类
建筑与水利引用本文复制引用
贾瑞旗,郑慧洋..沿海地区某水闸汛期施工导流方案研究[J].东北水利水电,2025,43(10):11-13,3.