江西建材Issue(8):315-317,327,4.
复杂条件下季节性浸水路堤施工技术研究
Research on Construction Technology of Seasonal Immersion Embankments under Complex Conditions
裴志超 1曾鹏 1李国伟1
作者信息
- 1. 中国水利水电第六工程局有限公司,辽宁 沈阳 110170
- 折叠
摘要
Abstract
This paper takes the immersion embankment project of the Dadushan Reservoir section from K0+940 to K1+460 in the East Ring Road Project of Yongxin County,Ji'an City,Jiangxi Province as a case.Aiming at the construction problems of seasonal immersion embankments under complex geological,hydrological and climatic conditions,a three-dimensional theoretical framework of water-force coupling,unsaturated soil mechanics and freeze-thaw cycle has been constructed.The collaborative reinforcement technology of base stone throwing for silt removal and waterproofing retaining wall is proposed.The silt is replaced by layer-by-layer throwing and filling of graded block stones,and the seepage is blocked by setting up deep mixed cement soil waterproofing retaining wall.The construction parameters are optimized through orthogonal tests.Engineering practice shows that this technology increases the bearing capacity of the foundation by 275%,keeps the total settlement within 10cm,significantly reduces the risk of water damage,shortens the construction period by 27%,and lowers the comprehensive cost by 22%.The research results provide scientific and feasible technical solutions and practical references for similar projects.关键词
季节性浸水路堤/复杂条件/抛石挤淤/隔水挡土墙/协同加固Key words
Seasonal flooded embankment/Complex conditions/Throwing stones to silt out/Water-proof retaining wall/Collaborative reinforce-ment分类
建筑与水利引用本文复制引用
裴志超,曾鹏,李国伟..复杂条件下季节性浸水路堤施工技术研究[J].江西建材,2025,(8):315-317,327,4.