陕西水利Issue(10):15-17,21,4.
MIKE21模型在珠江河口桥闸共建工程洪水影响评价中的研究与运用
Application of the MIKE21 Model in Flood Impact Assessment of the Joint Construction Project of Bridges and Gates in the Pearl River Estuary
李灿伦 1常赜 2董道蛟 2黄伟杰2
作者信息
- 1. 广州南沙经济技术开发区建设中心,广东 广州 511453
- 2. 珠江水利委员会珠江水利科学研究院,广东 广州 510610||水利部粤港澳大湾区水安全保障重点实验室,广东 广州 510000
- 折叠
摘要
Abstract
Due to the unique geographic location of the Pearl river estuary,bridge and gate structures are often built in close proximity,requiring comprehensive consideration of their impact on water conservancy and urban transportation.This study utilized a large-scale 1D-2D coupled hydrodynamic model encompassing the Pearl river delta river network and outer estuary to provide boundary conditions for a local 2D model built with MIKE21.The Lingxin avenue southern extension project in Nansha district,Guangzhou,including the Shijiuyong bridge and East sluice gate,was taken as the case study.Hydrodynamic changes before and after construction under different scenarios were simulated.Comparative analysis of design alternatives supported a separated structure solution-placing bridge piers within the gate wing walls-to minimize overall hydraulic impacts.The model demonstrated strong adaptability to estuarine hydrological variations and can accurately predict the impact of bridge-gate co-construction,offering a robust technical basis for flood impact assessments.关键词
MIKE21/珠江河口/桥闸共建Key words
MIKE21/Pearl river estuary/bridge-gate co-construction分类
建筑与水利引用本文复制引用
李灿伦,常赜,董道蛟,黄伟杰..MIKE21模型在珠江河口桥闸共建工程洪水影响评价中的研究与运用[J].陕西水利,2025,(10):15-17,21,4.