The overall leakage problem of Mulangang Reservoir was analyzed and evaluated based on the geological conditions.The possible leakage sections were identified,and the possible seepage amount of each section after wa-ter storage was estimated.Under the premise of not affecting the safety and operational benefit of the reservoir,anti-seepage measures may not be taken for the sections with relatively small seepage amount,and anti-seepage mea-sures should be taken only for the water retaining mountains in the sections with relatively large seepage amount.Electromagnetic wave CT was used along the anti-seepage grouting axis to identify the distribution and scale of the major karst leakage channels,based on which precise grouting are conducted to improve grouting effects and reduce anti-seepage cost.关键词
岩溶渗漏/渗漏量计算/线岩溶率/木浪岗水库Key words
karst leakage/calculation of seepage amount/linear karst rate/Mulanggang Reservoir分类