首页|期刊导航|云南水力发电|2×660MW火力发电机组工程水资源论证研究

2×660MW火力发电机组工程水资源论证研究

李仪 牛海州

云南水力发电2025,Vol.41Issue(10):4-8,5.
云南水力发电2025,Vol.41Issue(10):4-8,5.DOI:10.3969/j.issn.1006-3951.2025.10.002

2×660MW火力发电机组工程水资源论证研究

Research on Water Resources Demonstration of 2×660MW Thermal Power Generation Unit Project

李仪 1牛海州1

作者信息

  • 1. 池州市水利局,安徽 池州 247100
  • 折叠

摘要

Abstract

TBased on the 2×660 MW thermal generator unit project of Phase II expansion project of Chizhou Guoneng ShenwanChizhou Power Generation Co.,LTD.,the paper demonstrates and explores water resources,and analyzes the general situation of the expansion project and the current situation of water resources development and utilization in Chizhou City.The reasonableness of the project's water drawing from the Yangtze River,the scope of water source and the influence of water withdrawal were fully demonstrated,as well as the current situation of water drawing and utilization of the first phase of the project,the necessity of reconstruction and expansion,and the possibility of water utilization of the project.Finally,it was concluded that the water drawing,water withdrawal and water-saving plan of the reconstruction and expansion project was feasible and had reference value for the demonstration and implementation of water resources of similar thermal power generation projects.

关键词

改扩建项目/火力发电/水资源论证/节水

Key words

reconstruction and expansion project/thermal power generation/water resources demonstration/water conservation

分类

建筑与水利

引用本文复制引用

李仪,牛海州..2×660MW火力发电机组工程水资源论证研究[J].云南水力发电,2025,41(10):4-8,5.