康提北部综合供水项目岩石开挖方法

严建科 石家龙

云南水力发电2025,Vol.41Issue(10):131-136,6.
云南水力发电2025,Vol.41Issue(10):131-136,6.DOI:10.3969/j.issn.1006-3951.2025.10.034

康提北部综合供水项目岩石开挖方法

Rock Excavation Method of Kandy North Comprehensive Water Supply Project

严建科 1石家龙1

作者信息

  • 1. 中国水利水电第十四局工程局有限公司,云南 昆明 650200
  • 折叠

摘要

Abstract

Rock excavation in urban infrastructure projects presents significant technical,environmental,and safety challenges.Kandy North Integrated Water Supply Project serves as a case study demonstrating the application of controlled blasting and chemical splitting techniques to meet project requirements while minimizing environmental impact and ensuring safety.This article provides a detailed introduction to the methods used,the challenges encountered in densely populated areas,and the solutions developed to address regulatory and technical requirements.This study emphasizes the implementation of environmental control strategies and safety measures to ensure compliance with local and international standards,providing valuable insights for future projects and highlighting the key role of tailored excavation methods,safety management,and mitigating environmental impacts.

关键词

岩石开挖/控制爆破/化学裂解/环境管理/安全规程/基础设施项目

Key words

rock excavation/controlled blasting/chemical cracking/environmental management/safety regulation/infrastructure project