Abstract

Accurately assessing the renewable energy accommodation capacity of rural power systems is of significant guidance for the planning and development of new rural power systems.However,due to the low voltage levels,large impedance ratios,and higher network loss ratios in rural power systems,the traditional DC power flow-based time-series production simulations are prone to inaccuracies when evaluating their accommodation capacity.Therefor this paper proposes a time-series production simulation model and solution method based on refined AC power flow.Firstly,considering the voltage and network loss characteristics,a refined operational model for rural power systems based on AC power flow model is established.Then,to address the computational challenges of this model in annual time-series production simulation,the AC power flow is convexified and relaxed using second-order cone relaxation techniques to reduce model complexity.Furthermore,a time segmentation strategy that balances both grid scale and computational efficiency is introduced,It decomposes the time-series production model into multiple subproblems solved via rolling optimization,drastically improving computational performance.Finally,a county-level rural power system was used as an example for simulation testing.and the results verified the effectiveness of the method in accurately assessing the capacity for renewable energy integration.

关键词

农村电力系统/时序生产模拟/新能源/消纳能力评估/二阶锥松弛

Key words

rural power systems/time-series production simulation/renewable energy/accommodation capacity evaluation/second-order cone relaxation

引用本文复制引用

郑永乐,方家琨,韦仁博,冯宇昂,张艺涵,崔世常,武振宇,蒋小亮,李慧璇,艾小猛..农村新型电力系统精细化时序生产模拟方法[J].中国电力,2025,58(10):71-81,11.

基金项目

国家自然科学基金面上项目(52177088) (52177088)

国网河南省电力公司科技项目(兰考高比例新能源消纳演进技术研究,5217L0240012). This work is supported by National Natural Science Foundation of China(General Program)(No.52177088),Science and Technology Project of State Grid Henan Electric Power Company(Research on the Evolutionary Technology of High-Proportion Renewable Energy Consumption in Lankao,No.5217L0240012). (兰考高比例新能源消纳演进技术研究,5217L0240012)