水利水电技术(中英文)2025,Vol.56Issue(9):15-29,15.DOI:10.13928/j.cnki.wrahe.2025.09.002
三峡水库促进四大家鱼繁殖生态调度与综合利用需求协调性策略研究
Study on the coordinating strategy of the Three Gorges Reservoir for ecological operation to promote spawning of the four major Chinese carps and comprehensive utilization demand
摘要
Abstract
[Objective]The coordination strategy between ecological operations of the Three Gorges Reservoir(TGR)to promote the natural spawning of the Four Major Chinese Carps and other comprehensive utilization demands has yet to be clearly defined.To clarify the constraints of ecological operations and propose coordination strategies between ecological operations and other comprehensive utilization demands,[Methods]past ecological operation experiments,operation regulations and operation practice of the TGR are summarized.Additionally,the impacts of conducting ecological operations during the concentrated falling stage and the flood stage on other comprehensive utilization demands have been quantitatively analyzed.[Results]The result show that,ecological operations during the per-flood falling stage will result in water abandonment at Gezhouba Dam in 47.3%of years and water level daily decrease of the TGR exceeding 1 m in 47.3%of the years.The risk of water abandonment at Gezhouba Dam and water level daily decrease of the TGR exceeding 1 meter will be significantly mitigated by raising the water level of the TGR on June 10th or lowering it on May 25th.Water demand of the ecological operations in mid-June and late June during flood stage can not be satisfied under the typical year of P=90%.[Conclusion]Conclusion can be drawn as follows:if ecological operations were conducted during the pre-flood falling stage,there would be no constraints on water quantity and no impact on flood control,water supply,and navigation.However,there would be risks associated with water abandonment at Gezhouba Dam and water level daily decrease of the TGR exceeding 1 m.Conducting ecological operation during flood stage is mainly subject to water constraints,while flood control risks remain manageable.Considering ecological operations,optimal operational rules for the TGR can be formulated as follows:in years with relatively abundant inflow forecasts,the reservoir level can be preemptively lowered the water level by May 25th.Conversely,the water level on June 10th can be further raised to 150.0 m in years with deficient inflow forecasts.关键词
三峡水库/四大家鱼/生态调度/综合利用需求/协调性分析/影响因素Key words
Three Gorges Reservoir/four major Chinese carps/ecological operation/comprehensive utilization demand/coordination analysis/influence factor分类
建筑与水利引用本文复制引用
张启凡,荆平飞,李肖男,戴凌全,姜伟,王安琪..三峡水库促进四大家鱼繁殖生态调度与综合利用需求协调性策略研究[J].水利水电技术(中英文),2025,56(9):15-29,15.基金项目
中国长江三峡集团公司项目(202303298) (202303298)
国家重点研发计划项目(2022YFC3002705) (2022YFC3002705)
湖北省自然科学基金项目(2024AFB527) (2024AFB527)
长江勘测规划设计研究有限责任公司自主科研项目(CX2023S005) (CX2023S005)