交通节能与环保2025,Vol.21Issue(5):33-39,75,8.DOI:10.3969/j.issn.1673-6478.2025.05.007
隧道围岩低回弹早高强湿喷混凝土施工的减碳效应
Carbon Reduction Effect of Low Rebound Early High Strength Wet Shotcrete Construction of Tunnel Surrounding Rock
摘要
Abstract
To explore the differences in construction carbon emissions between traditional wet-shotcrete and low rebound early-high-strength wet-shotcrete for tunnel surrounding rocks,the Mingzi Mountain Tunnel of the Menglv Expressway in Yunnan Province was taken as the subject.Initially,the carbon emission quantification boundaries for the two types of wet-shotcrete construction were clarified,and the carbon emission sources were analyzed with the main thread of energy/resource consumption.Based on this,a carbon emission quantification index system was constructed by category.Subsequently,activity data such as material consumption and mechanical equipment energy consumption during the construction process were collected according to on-site surveys and design documents.Considering the source of raw materials for wet-shotcrete in the tunnel surrounding rock and the types of energy consumed in construction,criteria for selecting carbon emission factors were proposed.Finally,the carbon emissions of the two types of wet-shotcrete construction were quantified using the emission factor method,and their carbon reduction effects were analyzed.关键词
交通碳排放/减碳效应/排放因子法/湿喷混凝土/量化指标体系Key words
traffic carbon emissions/carbon reduction effect/emission factor method/wet shotcrete/quantitative index system分类
交通工程引用本文复制引用
李建民,江忠,刘东旭,刘奇,王坚..隧道围岩低回弹早高强湿喷混凝土施工的减碳效应[J].交通节能与环保,2025,21(5):33-39,75,8.基金项目
云南省交通运输厅科技创新及示范项目(云交科教便[2021]102号) (云交科教便[2021]102号)