首页|期刊导航|电力勘测设计|上跨地铁变电站施工对运营地铁区间隧道结构变形影响预测及分析

上跨地铁变电站施工对运营地铁区间隧道结构变形影响预测及分析

周森 邓永豪 林悦鑫 陈海健 黄叙

电力勘测设计Issue(10):65-72,8.
电力勘测设计Issue(10):65-72,8.DOI:10.13500/j.dlkcsj.issn1671-9913.2025.10.011

上跨地铁变电站施工对运营地铁区间隧道结构变形影响预测及分析

Prediction and Analysis of the Influence of the Construction of the Upper Span Subway Substation on the Structural Deformation of the Running Subway Tunnel

周森 1邓永豪 2林悦鑫 2陈海健 1黄叙1

作者信息

  • 1. 广州市电力工程设计院有限公司,广东 广州 510335
  • 2. 广东电网有限责任公司广州越秀供电局,广东 广州 510600
  • 折叠

摘要

Abstract

In order to study the influence of the construction of the upper span subway substation on the structural deformation and internal force of the running subway tunnel,a three-dimensional integral model is established by using Midas GTS/NX finite element analysis software on the background of the construction of Jinhan 110 kV substation,the deformation and internal force of adjacent subway structure caused by the whole process of substation construction are simulated and calculated,and the control measures for the safe operation of subway structure are proposed.The proposed implementation path can be used for reference for similar projects in the industry.

关键词

上跨地铁变电站/数值模拟/地铁隧道

Key words

upper span subway substation/numerical simulation/subway tunnel

分类

动力与电气工程

引用本文复制引用

周森,邓永豪,林悦鑫,陈海健,黄叙..上跨地铁变电站施工对运营地铁区间隧道结构变形影响预测及分析[J].电力勘测设计,2025,(10):65-72,8.