福建冶金2025,Vol.54Issue(6):1-4,4.
新疆某金矿全泥氰化工艺试验研究
Experimental Study on the All-Slime Cyanidation Process for a Gold Mine in Xinjiang
吴升 1何涛 1魏哲哲2
作者信息
- 1. 新疆金川矿业有限公司,新疆伊宁 835000
- 2. 江西理工大学,江西 赣州 341000||江西巨通实业有限公司,江西武宁 332300
- 折叠
摘要
Abstract
Due to geographical constraints,a gold mine in Xinjiang was developed relatively late.To promptly address the challenges of comprehensive gold recovery at this site,ore property analyses were conducted on two types of ore samples,followed by all-slime cyanidation tests.The results showed that under the conditions of a grinding fineness of 90%passing-200 mesh,a liquid-to-solid ratio of 2∶1,and a sodium cyanide concentration of 0.1%,the gold leaching rate of the mixed ore sample reached 74.74%after 24 hours of leaching,while the gold leaching rate of the oxidized ore sample reached 90.80%after 36 hours of leaching.These results demonstrate that effective gold recovery can be achieved under the tested conditions.关键词
金矿/氰化/浸出/氧化矿Key words
gold mine/cyanidation/leaching/oxidized ore引用本文复制引用
吴升,何涛,魏哲哲..新疆某金矿全泥氰化工艺试验研究[J].福建冶金,2025,54(6):1-4,4.