海河水利Issue(10):32-34,40,4.DOI:10.3969/j.issn.1004-7328.2025.10.007
册田水库大坝上游护坡修复工程设计
Upstream Slope Protection Rehabilitation Project of the Cetian Reservoir Dam
黄小龙 1王爽2
作者信息
- 1. 中国水利水电建设工程咨询渤海有限公司,天津 300222
- 2. 中水北方勘测设计研究有限责任公司,天津 300222
- 折叠
摘要
Abstract
After years of operation,the upstream slope protection of the Cetian Reservoir Dam in Datong City has suffered severe damage due to the thin thickness of the stone masonry blocks,the relatively low construction standards at the time,and the long-term effects of freezing,thawing,and wave erosion.Large areas of prefabricated concrete blocks on the dam slope have become unstable,and localized collapses have occurred in the foundation layer of the mortared stone slope protection.Based on the actual conditions of the project,multiple repair schemes were compared,and a reasonable and economical slope protection type for the upstream dam slope was determined.Practical operation of the project has proven its effectiveness,eliminating safety hazards during dam operation and ensuring the normal functioning of the reservoir.The findings provide technical support for the design of dam slope protection in similar projects in northern regions.关键词
大坝护坡/修复设计/方案比选/册田水库Key words
dam slope protection/repair design/scheme comparison/Cetian Reservoir分类
建筑与水利引用本文复制引用
黄小龙,王爽..册田水库大坝上游护坡修复工程设计[J].海河水利,2025,(10):32-34,40,4.