建筑设计管理2025,Vol.42Issue(9):83-88,6.DOI:10.3969/j.issn.1673-1093.2025.09.010
七年铸剑非洲梦
Seven Years of Forging a Dream for Africa:A Review of the China-Aided N'Djamena Stadium Project in Chad
潘海迅1
作者信息
- 1. 上海建筑设计研究院有限公司,上海 200041
- 折叠
摘要
Abstract
In foreign-aid projects,numerous unforeseen circumstances may arise,encompassing various aspects such as geology,climate,ecology,culture,customs,and economy.Thus,both design and construction phases necessitate meticulous consideration of the recipient country's regional characteristics while embodying the donor country's intrinsic attributes.The adoption of tailored design strategies in the pre-design phase,the dynamic optimization and equilibrium adjustment of construction processes in response to real-time on-site variables,and the systematic assessment of lessons learned post-completion constitute critical principles for ensuring the success of foreign-aid initiatives.关键词
援外工程/地域性/设计策略/平衡/后评估Key words
foreign-aid projects/regionality/design strategies/equilibrium/post-evaluation分类
土木建筑引用本文复制引用
潘海迅..七年铸剑非洲梦[J].建筑设计管理,2025,42(9):83-88,6.