In order to restore reservoir storage capacity,a joint sediment discharge operation was implemented at the Wanjiazhai and Longkou reservoirs from August 30 to September 7,2022.The key findings include:a)Wanjiazhai Reservoir achieves a scouring volume of 26.65 mil-lion tons with a sediment discharge ratio(SDR)of 935.42%,while Longkou Reservoir discharges 43.09 million tons(SDR:144.40%).Their combined SDR reaches to 1 350.78%,significantly recovering storage capacity.b)Compared to 2011-2018 operations,post-2018 flushing efficiency is improved markedly.The SDR of Wanjiazhai Reservoir has shown a significant growth trend.Longkou Reservoir has changed from siltation to scouring,and the combined sediment discharge effect has been optimized.c)During the 40-hour drawdown opera-tion period at Sanmenxia Reservoir,the SDR reaches to 995.78%(scouring:27.599 9 million tons),whereas the SDR of Xiaolangdi Reser-voir is only 3.99%SDR(deposition:38.91 million tons).d)The overall siltation in the lower reaches of the Yellow River is 1.809 7 million tons(SDR:32.2%).It is suggested to optimize the timing and discharge parameters for the joint operation of reservoir groups on the main river channel to enhance overall sediment reduction benefits.关键词
水库排沙/泥沙冲淤/排沙比/联合排沙调度/万家寨水库/龙口水库Key words
sediment discharge/scouring and siltation/sediment discharge ratio/joint sediment discharge operation/Wanjiazhai Reservoir/Longkou Reservoir分类
建筑与水利引用本文复制引用
段文龙,仓博..万家寨、龙口水库2022年联合排沙调度效果分析[J].人民黄河,2025,47(11):50-54,78,6.基金项目
国家重点研发计划项目(2023YFC3208603) (2023YFC3208603)