金沙江上游叶巴滩水电站下闸蓄水方案优化研究

夏勇 祝海霞

四川水力发电2025,Vol.44Issue(5):7-11,5.
四川水力发电2025,Vol.44Issue(5):7-11,5.DOI:10.20196/j.cnki.scslfd.20250502

金沙江上游叶巴滩水电站下闸蓄水方案优化研究

Optimization study on the impoundment of Yebatan Hydropower Project in the upstream of the Jinsha River

夏勇 1祝海霞2

作者信息

  • 1. 华电金沙江上游水电开发有限公司叶巴滩分公司,四川 甘孜 610041
  • 2. 中国电建集团成都勘测设计研究院有限公司,四川 成都 610072
  • 折叠

摘要

Abstract

Taking the impoundment of Yebatan Hydropower Project as an example,this papaer introduces the general principles of impoundment,analyzes the key factors influencing the impoundment,puts forward a phased route based on risk management,and proposes an optimized plan.Ultimately,it defines control indicators such as sluice closing after the flood season in mid-October and controlling the water storage rate to no more than 5 m/d.It also proposes measures such as establishing a multi-level risk prevention and control mechanism to effectively ensure project safety and achieve scheduled power generation.This study provides an important reference for impoundment at similar large hydropower projects and can serve as a reference for subsequent projects.

关键词

启闭机设计容量/导流洞堵头初期蓄水/蓄水计算

Key words

hoist design capacity/initial impoundment of diversion tunnel plug/impoundment calculation