永新煤矿2A303综采工作面顶板支护设计研究

郭德洋 杨永峰 许志强

山东煤炭科技2025,Vol.43Issue(10):64-67,72,5.
山东煤炭科技2025,Vol.43Issue(10):64-67,72,5.DOI:10.3969/j.issn.1005-2801.2025.10.013

永新煤矿2A303综采工作面顶板支护设计研究

Research on Roof Support Design of the 2A303 Fully Mechanized Mining Face in Yongxin Coal Mine

郭德洋 1杨永峰 1许志强1

作者信息

  • 1. 库车市永新矿业有限责任公司,新疆 库车 842000
  • 折叠

摘要

Abstract

Aiming at the problems of unstable roof control,strong mine pressure behavior,severe roadway deformation,poor management of harmful gases and coal dust,low production efficiency and so on in the 2A303 fully mechanized mining face of Yongxin Coal Mine,based on mine pressure theory,numerical simulation,and dynamic monitoring technology,a roof dynamic control mode of"timely support+process collaboration"is proposed,combined with comprehensive measures such as hydraulic fracturing weakening,advanced support strengthening,and remote control,etc.,through implementing technologies such as bracket initial support force of≥24 MPa,advanced support density of 4 rods/m,hydraulic fracturing water injection pressure of 35 MPa and others,the roof layer separation and mine pressure behavior are effectively suppressed,the roof subsidence amount is controlled to≤200 mm/cycle,the roadway deformation amount is decreased to 20 mm/shift,the corner gas concentration is controlled below 0.8%,the coal dust concentration is decreased to 10 mg/m3,the working face advancement speed is improved to 5 m/d,and the equipment failure rate is decreased to below 3%.The results show that the technical scheme significantly improves the safety,stability,and production efficiency of the working face,provides scientific basis and practical experience for safe and efficient mining under complex geological conditions.

关键词

永新煤矿/综采工作面/顶板支护设计

Key words

Yongxin Coal Mine/fully mechanized mining face/roof support design