桥上无缝道岔智能化分析系统研发

张泽

铁道标准设计2025,Vol.69Issue(11):33-39,7.
铁道标准设计2025,Vol.69Issue(11):33-39,7.DOI:10.13238/j.issn.1004-2954.202403010007

桥上无缝道岔智能化分析系统研发

Development of an Intelligent Analysis System for Seamless Turnouts on Bridges

张泽1

作者信息

  • 1. 中铁第四勘察设计院集团有限公司线路站场设计研究院,武汉 430063||铁路轨道安全服役湖北省重点实验室,武汉 430063
  • 折叠

摘要

Abstract

Compared with continuous welded rail on bridges,the mechanical behavior of seamless turnouts on bridges is more complex,and specialized calculations are required for each seamless turnout at every elevated station during the design phase.To address issues of complex calculation models,numerous parameters,and significant theoretical challenges for seamless turnouts at elevated stations,a calculation system for seamless turnouts on bridges with completely independent intellectual property rights was developed.This system was based on the turnout-bridge-pier interaction mechanism,utilized C# for interface development,and adopted a finite element secondary development language for kernel programming.Compared with existing software,the developed seamless turnout system featured the following innovations.It enabled'one-click input'of multi-disciplinary data for railway,bridge,and tunnel engineering,dynamic visualization of design parameters,'one-click modeling'and'one-click calculation'of highly nonlinear coupled models for seamless turnouts in large marshalling stations,and'one-click output'of intelligent analysis results,parameter verification,and calculation reports for seamless turnouts on bridges.Taking a group of seamless turnouts at an elevated station on the Nanchang-Jiujiang High-speed Railway as an engineering case,this study introduced the application of the system in parameter input,model establishment,result analysis,and other aspects.The system has already been applied to the design of seamless turnouts on bridges in multiple projects,and the calculation time for groups of seamless turnouts on bridges at complex bridge sites can be controlled within 1 hour.

关键词

铁路桥梁/高架站/无缝道岔/智能化分析/系统研发

Key words

railway bridge/elevated station/seamless turnout/intelligent analysis/system development

分类

交通运输

引用本文复制引用

张泽..桥上无缝道岔智能化分析系统研发[J].铁道标准设计,2025,69(11):33-39,7.

基金项目

国家重点研发计划课题(2022YFB2602900) (2022YFB2602900)

中国铁建股份有限公司科技研发计划项目(2022-A02) (2022-A02)

中铁第四勘察设计院集团有限公司科技研发课题(KY2022006S,2021K004) (KY2022006S,2021K004)

中国铁路上海局集团有限公司科研开发课题(2021141) (2021141)

铁道标准设计

OA北大核心

1004-2954

访问量0
|
下载量0
段落导航相关论文