| 注册
首页|期刊导航|云南冶金|"P-M"注浆堵水技术在某矿山巷道局部涌水治理中的应用

"P-M"注浆堵水技术在某矿山巷道局部涌水治理中的应用

高家凡 刘龙海 吴朝艳 罗秀清

云南冶金2025,Vol.54Issue(5):26-31,6.
云南冶金2025,Vol.54Issue(5):26-31,6.

"P-M"注浆堵水技术在某矿山巷道局部涌水治理中的应用

Application of"P-M"Grouting Technique for the Local Water Inrush Problem in Mine Roadways

高家凡 1刘龙海 2吴朝艳 1罗秀清3

作者信息

  • 1. 昆明风景矿业有限公司,云南 昆明 654100
  • 2. 昆明志欣诚矿业有限公司,云南 昆明 654100
  • 3. 昆明和安矿业有限公司,云南 昆明 650200
  • 折叠

摘要

Abstract

Aiming at the shortcomings of traditional grouting for water blockage,such as high pressure in water-blocking holes and high consumption of grouting materials,the"P-M"grouting water blockage technology was proposed.In a practical application at a mine,this technology increased operational efficiency by 26.01%,improved material utilization by 14.9%,and reduced grouting costs by 1,581.05 yuan,providing a valuable reference for similar mining operations.

关键词

局部涌水/"P-M"注浆/注浆堵水

Key words

local water inrush/"P-M"grouting/grouting for water plugging

分类

矿业与冶金

引用本文复制引用

高家凡,刘龙海,吴朝艳,罗秀清.."P-M"注浆堵水技术在某矿山巷道局部涌水治理中的应用[J].云南冶金,2025,54(5):26-31,6.

云南冶金

1006-0308

访问量0
|
下载量0
段落导航相关论文