中国防汛抗旱2025,Vol.35Issue(10):41-45,50,6.DOI:10.16867/j.issn.1673-9264.2025162
黑龙江五大连池东风村"7·12"暴雨山洪灾害分析
Analysis and study of"7·12"flash flood disaster in Dongfeng Village,Wudalianchi City,Heilongjiang Province
摘要
Abstract
In the evening of July 12,2022,rainstorm suddenly fell in Dongfeng Village,Wudalianchi City,Heilongjiang Province.The rainfall exceeded 90 mm at 18:19 on July 12,causing local flash flood disaster,which caused serious damage to the lives and properties of local residents.Based on the results of post disaster investigation,a rapid recovery strategy for flash flood disasters is proposed by combining empirical formula method and distributed hydrological simulation.Through scientific analysis of the occurrence,development and response process of this disaster,the formation mechanism of the disaster is revealed and the disaster magnitude is determined.Through distributed hydrological simulation,the peak flow rate of this flash flood disasterreached 579.47 m3/s,which is about 10 times the design peak flow rate(58 m3/s)of Dongfeng Village section with a 100 year return period,far exceeding the current flood control capacity of the village.After investigation,analysis,and comprehensive analysis,it has been determined that the flash flood disaster was mainly caused by the combined effects of heavy rainfall and large-scale river topography;At the same time,the lack of monitoring and early warning stations in the upstream rainstorm area of the region is also one of the main reasons for the failure of timely and accurate early warning of the disaster.The research results can provide scientific recommendations for future flash flood prevention in the region.关键词
山洪灾害/致灾机理/分布式水文模拟/模拟分析Key words
flash flood disaster/disaster mechanism/distributed hydrological modelling/modelling analysis分类
水利科学引用本文复制引用
马强,王昱,郝思佳,连歆翼,汪杨自远,蔡茜媛,刘昌军..黑龙江五大连池东风村"7·12"暴雨山洪灾害分析[J].中国防汛抗旱,2025,35(10):41-45,50,6.基金项目
国家重点研发计划资助项目(2023YFC3006702) (2023YFC3006702)
中国水利水电科学研究院"五大人才"项目(WH0145B062022). (WH0145B062022)