| 注册
首页|期刊导航|中国铁道科学|移动闭塞与虚拟编组列车追踪间隔时间计算方法

移动闭塞与虚拟编组列车追踪间隔时间计算方法

田长海 张守帅 徐意 蔡涛 盛天一

中国铁道科学2025,Vol.46Issue(5):203-213,11.
中国铁道科学2025,Vol.46Issue(5):203-213,11.DOI:10.3969/j.issn.1001-4632.2025.05.18

移动闭塞与虚拟编组列车追踪间隔时间计算方法

Calculation Method of Train Tracking Interval Time for Moving Block and Virtual Coupling

田长海 1张守帅 2徐意 3蔡涛 4盛天一5

作者信息

  • 1. 中国铁道科学研究院集团有限公司 铁道科学技术研究发展中心,北京 100081
  • 2. 西南交通大学 交通运输与物流学院,四川 成都 611756
  • 3. 中国铁道科学研究院集团有限公司 工程咨询公司,北京 100081
  • 4. 中国铁道科学研究院 研究生部,北京 100081||中国铁道科学研究院集团有限公司 通信信号研究所,北京 100081
  • 5. 中国铁道科学研究院 研究生部,北京 100081
  • 折叠

摘要

Abstract

Moving block and virtual coupling play a significant role in enhancing traffic capacity and optimizing transportation organization,representing the latest advancements in the field of rail transit.Given the close interconnection between moving block and virtual coupling,the calculation method of train tracking interval time during tight tracking operations is investigated.Firstly,the basic principles of train operation control and tracking operation are analyzed under 2 modes of train operation:moving block and virtual coupling.Then,for the main tight tracking operation scenarios,the calculation methods for the tracking interval distance and tracking interval time of train section tracking,train departure tracking,train arrival tracking,and train passing tracking under moving block and virtual coupling are proposed respectively,explaining the meanings and value methods of each parameter in the calculation formula.Finally,combined with actual calculation cases,taking 350 km·h-1 EMU trains and 90 km·h-1 ordinary freight trains as representatives of high-speed railways and conventional-speed railways,the tracking interval distance and tracking interval time during tight tracking operation of trains under 2 operation modes are calculated.The results show that within the virtual coupling fleet,the minimum tracking interval distance between two 350 km·h-1 EMU trains is about 5 100 m,and the minimum tracking interval distance between two 90 km·h-1 ordinary freight trains is about 1 000 m.Under virtual coupling,the tracking interval time of 4 types of trains is significantly compressed compared with those under moving block,with a compression effect of over 46.5%.

关键词

铁路运输组织/移动闭塞/虚拟编组/列车追踪间隔时间/通过能力

Key words

Railway transportation organization/Moving block/Virtual coupling/Train tracking interval time/Traffic capacity

分类

交通运输

引用本文复制引用

田长海,张守帅,徐意,蔡涛,盛天一..移动闭塞与虚拟编组列车追踪间隔时间计算方法[J].中国铁道科学,2025,46(5):203-213,11.

基金项目

中国国家铁路集团有限公司科技研究开发计划课题(J2024X007) (J2024X007)

中国铁道科学

OA北大核心

1001-4632

访问量0
|