[Objective]Controlling surface thermal stress during the construction of concrete-face rockfill dams(CFRDs)is critical for preventing early cracking in the face slabs.This study investigates the effects of bottom constraints and internal-external temperature differences on thermal stress in CFRDs during their construction.[Method]Based on the Kaihua Reservoir project,a finite element model was developed to simulate temperature distribution and thermal stress of the face slab during different construction periods and schemes.The spatial distribution of surface thermal stress and allowable concreting temperatures were analyzed,from which we evaluated the effectiveness of various control measures in mitigating thermal stress.[Result]Bottom constraints significantly influenced surface thermal stress,with a critical friction coefficient of 0.6.The roller-compacted mortar slope protection method implemented at Kaihua Reservoir ensured that the bottom friction coefficient remained below this critical value,highlighting the importance of construction quality.Under fixed bottom constraints,the temperature difference between the inside and outside of the face slab was the primary factor driving surface thermal stress.Greater internal-external temperature differences led to higher thermal stress,whereas applying maintenance blankets could effectively reduce both temperature differences and stress levels.Thinner face slabs exhibited smaller internal-external temperature differences.Maximum surface thermal stress occurred in the middle to lower sections of the slab,approximately 28-52 meters from the toe board.Under cold wave conditions,the design thermal stress of the face slab remained below the allowable tensile strength.[Conclusion]We propose an allowable concreting temperature for the Kaihua Reservoir face slab.Comparisons show that the results of the proposed method are consistent with on-site measurements,and that its actual temperatures remained below the critical threshold.Ensuring a bottom friction coefficient below the critical value and timely application of maintenance blankets after face slab construction can effectively prevent cracking of the CFRD face slabs.Our results provide design guidance for thermal stress control during construction of concrete-face rockfill dams.

关键词

面板/底部约束/内外温差/温度应力控制措施/允许浇筑温度/开化水库

Key words

face slab/bottom constraint/temperature difference between inside and outside/thermal stress control measures/allowable concreting temperature/Kaihua Reservoir

分类

农业科学

引用本文复制引用

肖勇涛,何育才,陆立志,刘守军,苏杰循,李玉,颜凡新..混凝土面板堆石坝施工期面板温度应力及控制措施研究[J].灌溉排水学报,2025,44(11):38-46,9.

基金项目

国家自然科学基金项目(51309099) (51309099)

浙江省水利科技重点项目(RC2001) (RC2001)

中国南水北调集团水网水务投资有限公司科研项目(NSBD-KHSK-(FW)-16) (NSBD-KHSK-(FW)

灌溉排水学报

1672-3317

访问量0
|
下载量0
段落导航相关论文