| 注册
首页|期刊导航|中国水利|融冰期西辽河主要控制断面流量变化规律及水库优化调度策略

融冰期西辽河主要控制断面流量变化规律及水库优化调度策略

朱钦博 潘英华 王海玲

中国水利Issue(21):41-46,6.
中国水利Issue(21):41-46,6.DOI:10.3969/j.issn.1000-1123.2025.21.007

融冰期西辽河主要控制断面流量变化规律及水库优化调度策略

Flow variation patterns at major control sections of the Xiliao River during the ice-melting period and optimized reservoir operation strategies

朱钦博 1潘英华 2王海玲1

作者信息

  • 1. 内蒙古自治区水文水资源中心,010010,呼和浩特
  • 2. 内蒙古自治区水利事业发展中心,010010,呼和浩特
  • 折叠

摘要

Abstract

Against the backdrop of the spring 2025 operation of the Xiliao River,this study focuses on the joint operation of reservoirs and the flow process at the Hairisu Hydrological Station,systematically revealing the synergistic relationships among river ice melting,reservoir operation,and flow evolution,and exploring more reasonable reservoir operation modes during the spring dispatch period.Research indicates that at the early stage of ice melting,the outflow from reservoirs should be appropriately increased under the premise of ensuring flood safety to accelerate the melting of the ice cover and seize the favorable scheduling window.After the ice cover breaks,the combined reservoir discharge should be adjusted in a timely manner according to the flow variation nodes observed at the Hairisu Hydrological Station.In the early stage of river opening,the combined reservoir discharge can be increased to 20~30 m3/s;during the middle and late stages,it should be gradually increased to offset the growing infiltration losses,reaching 50~60 m3/s to meet the optimal dispatch flow of 60 m3/s at the Hairisu Hydrological Station.During the free-flow period,the combined reservoir discharge should continue to increase,while the reservoir release strategy should be adjusted following the"delayed adjustment"principle to avoid the impact of flood peak superposition.This study provides theoretical support and practical guidance for the scientific decision-making and optimized management of ecological water dispatch in the Xiliao River basin.

关键词

西辽河/融冰期/流量特征/水库联合调度/水文响应/控制断面/下泄流量

Key words

the Xiliao River/ice-melting period/flow characteristics/joint reservoir operation/hydrological response/control section/discharge flow

分类

建筑与水利

引用本文复制引用

朱钦博,潘英华,王海玲..融冰期西辽河主要控制断面流量变化规律及水库优化调度策略[J].中国水利,2025,(21):41-46,6.

中国水利

1000-1123

访问量0
|
下载量0
段落导航相关论文