华侨大学学报(自然科学版)2025,Vol.46Issue(6):646-653,8.DOI:10.11830/ISSN.1000-5013.202508001
大型会展中心"一模到底"BIM总控管理模式
"One-Model-to-the-End"BIM Master Control Management Mode for Large Convention and Exhibition Center
摘要
Abstract
To systematically solve the technical bottlenecks in the construction of large-scale convention and exhibition centers,such as low efficiency among multi-stakeholder collaboration,difficulties in seamless data transfer,difficulties in complex structural construction control,and high requirements of lightweight operation and maintenance,Xiamen International Convention and Exhibition Center is taken as the research object,and the"one-model-to-the-end"building information model(BIM)master control management mode is proposed.Taking BIM throughout the full life cycle of construction as the core,the collaborative management and control system ensure the continuity of the model and the seamless data transfer by standardized management mecha-nism and technological innovation.The results show that"one-model-to-the-end"BIM master control manage-ment mode can systematically open up the digital chain across the full life cycle of large-scale public buildings,and provide the industry with a replicable BIM implementation paradigm.关键词
建筑信息模型/总控管理模式/全生命周期管理/"一模到底"/协同机制Key words
building information model/master control management mode/full life cycle management/"one-model-to-the-end"/collaborative mechanism分类
土木建筑引用本文复制引用
叶青,张坤荣,李悦..大型会展中心"一模到底"BIM总控管理模式[J].华侨大学学报(自然科学版),2025,46(6):646-653,8.基金项目
福建省创新战略研究项目(2025R0035) (2025R0035)
福建省厦门市智能建造"揭榜挂帅"课题(XJK2025-1-7) (XJK2025-1-7)