科技创新与应用2025,Vol.15Issue(33):156-160,5.DOI:10.19981/j.CN23-1581/G3.2025.33.039
G664改建工程施工关键技术与安全保障措施研究
李道伟 1杜杭 1王磊 1宁恒1
作者信息
- 1. 四川省交通建设集团有限责任公司,成都 610041
- 折叠
摘要
Abstract
The G664 reconstruction project of the Shangri-la-Geka(Sichuan-Yunnan boundary)section in Daocheng County is a major highway project located in the alpine plateau area of western Sichuan which spans a total length of 57.311 kilometers and includes various engineering contents such as tunnels,bridges,and culverts.This paper mainly introduces the anti-slide pile construction technology in this project,focusing on analyzing the hole forming method of pile foundation joist,pile foundation design and construction methods,and safety measures taken during the construction process.The project adopts the bored cast-in-place pile construction technique,which successfully overcomes the technical challenges of pile foundation construction under complex geological conditions.Through strict control of pile foundation construction quality and implementation of safety technical measures,the project effectively ensured the stability and safety of the structure.At the same time,this paper also discusses environmental protection measures taken during the construction process and flexible response strategies to deal with complex geological changes.This research provides strong technical support and valuable experience for similar projects,and has important reference value.关键词
G664改建工程/抗滑桩施工/挖孔灌注桩/安全保障措施/稳定性Key words
G664 reconstruction project/anti-slide pile construction/bored cast-in-place pile/safety measures/stability分类
交通工程引用本文复制引用
李道伟,杜杭,王磊,宁恒..G664改建工程施工关键技术与安全保障措施研究[J].科技创新与应用,2025,15(33):156-160,5.