输水管道穿越河渠方式选择

郭品

海河水利Issue(11):34-37,4.
海河水利Issue(11):34-37,4.DOI:10.3969/j.issn.1004-7328.2025.11.008

输水管道穿越河渠方式选择

Selection of Methods for Water Conveyance Pipelines Crossing River Channels

郭品1

作者信息

  • 1. 中交天航环保工程有限公司 天津 300461
  • 折叠

摘要

Abstract

In this paper,the basic processes,characteristics,limitations,and engineering applications of three construction methods for water conveyance pipelines crossing river channels were introduced.Combined with four river channel crossings in a specific water conveyance pipeline project,the main factors influencing the selection of the crossing method were analyzed,such as horizontal alignment,flood assessment requirements,water conveyance operation conditions,soil properties,surrounding environment,and project investment.Through comparison and selection,the open-cut method was finally determined for the crossings of the Luanle Main Canal and the Bei River,while the horizontal directional drilling(HDD)method was adopted for the crossings of the water conveyance main canal and the upper section of the Su River.The research results provide references for the selection of crossing methods for similar water conveyance pipeline projects.

关键词

输水管道/穿越/明挖/定向钻/顶管

Key words

water conveyance pipeline/crossing/open-cut/directional drilling/pipe jacking

分类

建筑与水利

引用本文复制引用

郭品..输水管道穿越河渠方式选择[J].海河水利,2025,(11):34-37,4.

海河水利

1004-7328

访问量0
|
下载量0
段落导航相关论文