| 注册
首页|期刊导航|山东煤炭科技|厚煤层断层带与陷落柱区综采工作面顶板协同控制技术研究

厚煤层断层带与陷落柱区综采工作面顶板协同控制技术研究

唐晓春

山东煤炭科技2025,Vol.43Issue(11):24-29,6.
山东煤炭科技2025,Vol.43Issue(11):24-29,6.DOI:10.3969/j.issn.1005-2801.2025.11.006

厚煤层断层带与陷落柱区综采工作面顶板协同控制技术研究

Research on Fully Mechanized Mining Face Roof Collaborative Control Technology of Thick Coal Seam Fault Zone and Collapse Column Area

唐晓春1

作者信息

  • 1. 西山煤电集团镇城底矿安全管理中心,山西 太原 030203
  • 折叠

摘要

Abstract

In view of the roof stability problem of the 28210 fully mechanized mining face under complex geological conditions,a roof control technology aiming at fault zones and collapse column areas is proposed.By analyzing the impact of factors such as mine pressure fluctuation and roof deformation and others on the safety of the working face,technologies such as advanced grouting reinforcement in fault zones,flexible support in collapsed column areas,lagging support of brackets,blasting roof cutting and intelligentization posture adjustment system,etc.,are applied.In practical applications,the effectiveness of each item of technical measures is verified by comparing the data of mine pressure,roof displacement,and system response time before and after the technologies application.The results indicate that after application,the mine pressure is generally decreased,the roof displacement is significantly reduced,and the system response time is significantly shortened,among them,the intelligentization posture adjustment system shortens the response time from 15 minutes to 5 minutes,and the early warning accuracy rate of roof displacement exceeding reaches 92%,which significantly improve the dynamic adaptability and safety guarantee level,and further promote the development of mine safety production technologies.

关键词

综采工作面/断层带/陷落柱/顶板控制/智能化调姿

Key words

fully mechanized mining face/fault zone/collapse column/roof control/intelligent posture adjustment

分类

矿业与冶金

引用本文复制引用

唐晓春..厚煤层断层带与陷落柱区综采工作面顶板协同控制技术研究[J].山东煤炭科技,2025,43(11):24-29,6.

山东煤炭科技

1005-2801

访问量0
|
下载量0
段落导航相关论文