Abstract

To enhance the resource utilization rate of fine-grained refractory gold ores,a combined process of flotation and leaching was studied for the extraction of gold from the Kamator gold ore in Kyrgyzstan(Au 3.07 g/t,Ag 20.40 g/t).The results show that a gold concentrate with a grade of 28.57 g/t can be obtained through closed-circuit flotation,with a gold yield and recovery rate of 8.05%and 72.47%,respectively,and the gold grade of the flotation tailings is 0.95 g/t.Under suitable conditions,the average gold leaching rate of the flotation tailings can reach 83.16%,with a relative gold recovery rate of 22.89%compared to the original ore,and the gold grade of the leaching residue is 0.16 g/t.By adopting the flotation-leaching process,the comprehensive gold recovery rate can reach 95.36%.This method can effectively recover gold from this type of ore.

关键词

吉尔吉斯斯坦/金矿石/浮选/浸出

Key words

Kyrgyzstan/gold ore/flotation/leaching

分类

矿业与冶金

引用本文复制引用

杨方圆,代淑娟,周南,高野,胡志刚..吉尔吉斯斯坦卡玛托尔金矿选矿试验研究[J].湿法冶金,2025,44(6):717-723,7.

基金项目

国家自然科学基金资助项目(52174254). (52174254)