江苏水利Issue(12):14-18,25,6.
基于CFD的泗阳二站水泵装置加固改造设计
Reinforcement and renovation design for the water pump device for Siyang Second Station based on CFD
YANG Mo 1ZHANG Xuan 1DONG Qiuzhi 1CHEN Jiaqi1
作者信息
- 1. Luoyun Hydraulic Project Management Division of Jiangsu Province,Suqian 223800,China
- 折叠
摘要
Abstract
In response to the issues of high head and outdated performance of the original 2.8ZLQ-7.0 water pump at Siyang Second Station,a three-dimensional water pump model was established using CFD finite element software.Internal flow analysis and device performance prediction were conducted under different impeller diameters,flow rates,and blade angles.A reinforcement and renovation scheme using the TJ04-ZL-02 new water pump device was proposed,and internal flow analysis and device performance analysis were conducted under different operating conditions.The study showed that after reducing the rotational speed of the existing water pump device from 150 r/min to 136.4 r/min,increasing the blade angle or enlarging the impeller diameter failed to meet the design requirements for flow rate under the design head condition.With the adoption of the TJ04-ZL-02 water pump,when the impeller diameter was 2,850 mm and the rotational speed was 150 r/min,a higher unit efficiency could be achieved under the design head.If the impeller diameter was increased to 2,950 mm,the rotational speed could be reduced to 136.4 r/min for operation.关键词
水泵装置/数值模拟/装置效率/性能曲线Key words
water pump device/numerical simulation/device efficiency/performance curve分类
建筑与水利引用本文复制引用
YANG Mo,ZHANG Xuan,DONG Qiuzhi,CHEN Jiaqi..基于CFD的泗阳二站水泵装置加固改造设计[J].江苏水利,2025,(12):14-18,25,6.