| 注册
首页|期刊导航|陕西水利|水利枢纽工程船闸闸首三维有限元计算分析

水利枢纽工程船闸闸首三维有限元计算分析

Xie Yijing Cui Xiaogeng Liu Jia

陕西水利Issue(1):9-12,16,5.
陕西水利Issue(1):9-12,16,5.

水利枢纽工程船闸闸首三维有限元计算分析

Three-Dimensional Finite Element Analysis of the Lock Head Structure in a Hydraulic Hub Project

Xie Yijing 1Cui Xiaogeng 2Liu Jia1

作者信息

  • 1. Northeast Investigation,Design and Research Co.,Ltd.,Changchun 130061,Jilin||Research Center for Cold Region Engineering Technology,Ministry of Water Resources,Changchun 130061,Jilin
  • 2. Northeast Investigation,Design and Research Co.,Ltd.,Changchun 130061,Jilin
  • 折叠

摘要

Abstract

This study investigates the lock head of a major hydraulic hub project characterized by strongly developed karst features and densely distributed faults,which compromise the integrity and mechanical properties of the surrounding rock mass.Such geological conditions impose significant challenges to the stability and safety of the lock head structure.A three-dimensional finite element model was established to analyze the deformation response and stress distribution of the lock head side pier under karst-influenced foundations.The results provide a technical basis for determining appropriate foundation treatment measures.Furthermore,the deformation and stress behavior of the lock head under high hydraulic head and large thrust forces were evaluated,offering essential guidance for selecting a reasonable structural form.The findings serve as a reference for the design and safety assessment of similar lock head structures in hydraulic hub projects.

关键词

水利枢纽/船闸闸首/三维有限元/变形分析/应力分析

Key words

Hydraulic hub/lock head/three-dimensional finite element method/deformation analysis/stress analysis

分类

建筑与水利

引用本文复制引用

Xie Yijing,Cui Xiaogeng,Liu Jia..水利枢纽工程船闸闸首三维有限元计算分析[J].陕西水利,2026,(1):9-12,16,5.

陕西水利

1673-9000

访问量0
|
下载量0
段落导航相关论文