蒙古国嘎舒苏海图口岸跨境铁路方案研究

LIU Xinyuan YANG Leilei HU Meng

铁路物流2025,Vol.43Issue(12):40-46,7.
铁路物流2025,Vol.43Issue(12):40-46,7.DOI:10.16669/j.cnki.issn.2097-5899.202412090001

蒙古国嘎舒苏海图口岸跨境铁路方案研究

Study on Cross-Border Railway Scheme of Gashuunsukhait Port in Mongolia

LIU Xinyuan 1YANG Leilei 2HU Meng1

作者信息

  • 1. Overseas Business Division,China Railway Design Corporation,Tianjin 300000,China
  • 2. Track,Station Yard and Terminal Design Department,China Railway Design Corporation,Tianjin 300000,China
  • 折叠

摘要

Abstract

China and Mongolia have respectively constructed railways to the vicinity of the Ganqimaodu Port and Gashuunsukhait Port.However,there is no railway between these two port stations yet.Mongolia plans to build a cross-border railway at Gashuunsukhait Port to connect with China's proposed Ganqimaodu port railway.This study conducted a qualitative analysis and techno-economic comparison of the main technical standards for the cross-border railway at Gashuunsukhait Port in Mongolia,proposing two overall layout plans:Option Ⅰ and Option Ⅱ.By using the weighted-TOPSIS method,the two options were compared,with Option Ⅱ showing the highest closeness to the optimal solution.Additionally,it maximized the use of existing infrastructure and proximity to the port's planned residential area.Therefore,Option Ⅱ was recommended as the preferred option,providing a reference for the construction of the cross-border railway at Gashuunsukhait Port and the planning of other port railways,contributing to the further improvement of transportation and trade infrastructure between China and Mongolia.

关键词

嘎舒苏海图口岸/跨境铁路/边检场/换装场/方案比选/加权TOPSIS法

Key words

Gashuunsukhait Port/Cross-Border Railway/Border Inspection Yard/Interchange-Loading Yard/Scheme Comparison/Weighted-TOPSIS Method

分类

交通工程

引用本文复制引用

LIU Xinyuan,YANG Leilei,HU Meng..蒙古国嘎舒苏海图口岸跨境铁路方案研究[J].铁路物流,2025,43(12):40-46,7.