水电厂现地LCU国产化探索

夏国强 张捷 张玉平

水电站机电技术2025,Vol.48Issue(12):1-3,27,4.
水电站机电技术2025,Vol.48Issue(12):1-3,27,4.DOI:10.13599/j.cnki.11-5130.2025.12.001

水电厂现地LCU国产化探索

Exploration of LCU localization in hydropower plants

夏国强 1张捷 2张玉平2

作者信息

  • 1. 三峡水力发电厂,湖北 宜昌 443000
  • 2. 中国水利水电科学研究院,北京 100038
  • 折叠

摘要

Abstract

This paper examines the current status of localization of programmable logic controllers(PLCs)—the core control equipment used in hydropower plants—and presents a development pathway for localizing local control units(LCUs).The pathway includes hardware research and LCU drawing design,PLC hardware testing,PLC software testing,formulation of communication protocols,design of basic functional blocks,program design,joint development,on-site installation and commissioning,unit trial operation,and project acceptance for specific hydropower plants.A case study presents an LCU retrofit at a river-basin hydropower plant,in which the original imported LCU devices were replaced with domestically produced units.The retrofit achieved a much higher CPU main frequency than the foreign product and reduced the switchover time between service and standby CPUs from about 200 ms to about 50 ms,eliminated at the same time the disturbances caused by switching.The CPU scan speed also improved substantially over the foreign device,improving the signal-processing efficiency.Additional modifications included unifying external communication protocols and reinforcing PLC trusted functions.The applicability of the retrofitted LCU was verified through two years of monitoring under real operating conditions.

关键词

现地LCU/国产化/DCS系统

Key words

LCU/localization/DCS system